Maintenance KPIs for Apartments: Work Order Metrics, Costs and Overdue Orders
Maintenance KPIs measure how well a property handles repairs: on-time completion rate, the age of open work orders, backlog, work orders per unit, make-ready turn time and repair cost as a share of income. Track them in two layers. The trends tell you whether maintenance is getting better or worse; a weekly check of every open order tells you which ones are overdue, stuck or misrouted right now. Track tenant requests and make-ready work separately, since they run on different clocks. A work order is overdue when it's still open past the due date set by its priority: within 24 hours for an emergency and 3–5 business days for a routine request.
The worked example uses market data from RealAI, the real estate analyst built by Fundrise. Fundrise has bought, financed or managed 35,000+ residential units and has $7B in assets.
Below: the KPIs to track with formulas and starting thresholds, how to catch overdue work orders, common due dates by priority, who reviews what, and a worked example with next steps.
The maintenance KPIs to track
Thresholds are starting points; agree on them between the property manager and the asset manager, and adjust for the property's age and condition.
| Check | KPI | Formula | Watch | Act |
|---|---|---|---|---|
| Weekly | Backlog | Open orders ÷ average weekly closings over the last 4 weeks, in weeks of work | Over 1 week | Over 2 weeks |
| Weekly | Open-order aging | Share of open orders older than 10 days (track 0–5, 6–9 and 10+ days) | Over 15% | Over 25% |
| Weekly | Make-ready turn time | Ready date − move-out date | — | Over 7 days for a standard turn |
| Monthly | On-time completion rate | Orders closed by their due date ÷ (orders closed + open orders already past due) | Below 90% | Below 80% |
| Monthly | Preventive maintenance completion | Scheduled tasks done on time ÷ tasks due, including smoke and CO detector checks and HVAC filter changes | Below 90% | Below 80%, or any missed life-safety inspection |
| Monthly | Resident satisfaction | Survey score on completed orders | Falling two months in a row | — |
| Monthly | Work orders per unit | Orders in the last 12 months ÷ units | Up 15% on the prior year | Up 30% |
| Monthly | Repeat request rate | Orders for the same unit and category within 90 days ÷ all orders | Over 5% | Over 10% |
| Monthly | Cost per work order, by category | Repair spend in a category ÷ orders in that category | Up 10% on the prior year | Up 25% |
| Monthly | Repairs and maintenance ratio | Repairs and maintenance ÷ EGI; also track spend per unit, since low occupancy inflates the ratio | 5% above the local benchmark | 15% above |
| Monthly | Vendor share of repair spend | Vendor spend ÷ total repair spend | Up 10 points on the prior year | — |
| Quarterly | Units per technician | Units ÷ maintenance technicians | More units per technician than the budget assumes | — |
| Quarterly | Category mix | Share of orders by category (plumbing, HVAC, appliances, and so on) | A category's share rising two quarters in a row | — |
| Quarterly | Vendor completions | Orders completed and on-time rate by vendor | A vendor below the property's on-time rate | — |
Cost KPIs only work if the property manager records a cost on each work order; many don't, so check before relying on them. Category mix and repeat requests are the early signs of a capital need: rising plumbing or HVAC orders often mean a system is near the end of its life.
How to catch overdue work orders
The KPIs show the trend; they don't show which orders are stuck. A property can close 90% of orders on time and still have a no-heat call open for a week. So each week, check every open order.
Most overdue orders are waiting on one of six things, and each needs a different fix: parts on order, a licensed vendor, access to the unit, a team with more work than it can close, paperwork (done but never closed), or the wrong priority. These checks tell you which.
| Check | What it catches | Watch | Act |
|---|---|---|---|
| Past due | Orders still open after their due date | 1–3 days past due | More than 3 days past due, or any emergency past due |
| No update | No status change: often done but not closed, or forgotten | 3 days | 5 days |
| On hold | Waiting on parts or a vendor | 7 days | 14 days |
| Failed access | Entry attempted but not completed | 1 failed attempt | 2 failed attempts |
| Wrong priority | High-severity work (no heat, gas, flooding, no water) entered as routine, or cosmetic work entered as an emergency | Cosmetic marked Emergency | Any high-severity order marked Routine or Low |
| Repeat request | Same unit, same category: the first repair didn't fix the cause | 2 in 90 days | 3 in 90 days |
| Vendor fit | A vendor on a trade it rarely handles: possible misassignment worth reviewing | Under 3 jobs in that category in 12 months | — |
An under-rated order is the riskier mistake, so it goes straight to Act. Vendor fit stays a watch item: a new vendor or trade is often legitimate, so it's a question for the property manager, not a finding.
Common due dates by priority
On-time rates and past-due flags only mean something against agreed due dates. These are common operating targets, not legal deadlines. Check your management agreement, and check local law, since some states and cities set repair deadlines for heat, water and other essential services.
| Priority | Examples | Common response target | Common completion target |
|---|---|---|---|
| Emergency | Gas leak, flooding, no heat in winter, AC out in extreme heat or for vulnerable residents, sewage backup | Within 1–2 hours | Made safe the same day; resolved within 24 hours |
| Urgent | No hot water, AC out in mild weather, refrigerator out | Same day | 24–48 hours |
| Routine | Leaking faucet, sticking door, appliance noise | 1 business day | 3–5 business days |
| Cosmetic | Paint touch-ups, landscaping | — | 7–14 days, or the next scheduled visit |
Split tenant requests from make-ready work. Tenant requests run from the day the resident reports the problem; make-ready work runs from move-out. Mixed together, a heavy turn month looks like poor resident service, and a slow turn hides behind fast service calls. Report every KPI above for the two queues separately.
Who reviews what
The property manager and maintenance supervisor: daily. They own the queue.
-
Start each day with emergencies and anything high-severity, whatever priority it was entered at.
-
Work the past-due and no-update lists: close what's finished, reschedule what isn't, and record the reason.
-
Chase parts and vendors on anything on hold, with a date for each.
-
Follow up on failed access the same day, and give proper notice to enter.
-
Watch the backlog against staffing, and bring in a vendor before it passes two weeks of work.
The asset manager: weekly exceptions, monthly trends. They don't run the queue; they check that it's being run.
-
Each week, review Act items and any order that was on the last list and is still open. Life-safety and habitability issues (no heat, gas, flooding) go to the asset manager the same day, since they can bring insurance claims or legal exposure. Ask the property manager for the reason and a new date, with a reply within 2 business days, and escalate to the regional manager if there's no answer.
-
Each month, review on-time rate, aging, work orders per unit and repair spend against the budget and the local benchmark.
-
Treat repeat requests and a shifting category mix as capital questions. Three leaks in one unit in 90 days is usually a pipe or drain problem, not three separate repairs.
-
Each quarter, review vendor performance and ask about any job outside a vendor's usual trade.
Worked example: a maintenance review in Sacramento
The building is a hypothetical 240-unit, 1990s property in Sacramento (Sacramento County, CA) with 62 open work orders this week (38 tenant requests, 24 make-ready) and an average of 41 closed a week over the last four (32 and 9). Its figures are a sample; the repair benchmark and rent are county data. Act items have been past their threshold for two consecutive checks, except the no-heat call, which can't wait.
| Check | Property (sample) | Threshold: watch / act | Status | Next step |
|---|---|---|---|---|
| On-time completion rate | 78% of tenant requests last month | Below 90% / 80% | 🔴 Act | Find which priorities and categories miss most; turns may be pulling technicians off service calls. |
| Open-order aging | 21% of open tenant requests older than 10 days (8 of 38) | Over 15% / 25% | 🟠 Watch | Ask for a date on every order over 10 days. |
| Backlog | Tenant requests 1.2 weeks (38 ÷ 32); make-ready 2.7 weeks (24 ÷ 9) | Over 1 / 2 weeks | 🔴 Act: make-ready | Turns are crowding the queue; bring in a turn vendor until make-ready is under 2 weeks. |
| Work orders per unit | 4.3, up 8% on last year (1,040 vs. 960 orders) | Up 15% / 30% | 🟢 In line | — |
| Repairs and maintenance (T12) | 6.1% of EGI (county 5.15%) | 5% / 15% above county | 🔴 Act: 18% above | Review the largest invoices of the last three months, cost per order by category and vendor share of spend. |
| Make-ready turn time | 3 units over 7 days | Over 7 days | 🔴 Act | Each loses about $64 a day ($1,925 ÷ 30). Get a ready date per unit. |
| Wrong priority | 1 no-heat call marked Routine, open 2 days | Any high-severity order marked Routine | 🔴 Act | Restore heat today, with temporary heaters if parts are delayed. Reclassify it as Emergency, tell the asset manager today, and fix the category default. |
| Past due | 7 tenant requests, oldest 11 days past due, plus the no-heat call, past due as an emergency | 1–3 / 3+ days; any emergency | 🔴 Act | Reason and new date for each within 2 business days. |
| On hold | 3 orders, longest 16 days | 7 / 14 days | 🔴 Act | Get the parts or vendor date; past 14 days, try a second vendor. |
| Repeat request | 1 unit, 3 plumbing leaks in 90 days | 2 / 3 in 90 days | 🔴 Act | Find the source; treat it as a possible capital item, not another service call. |
| Vendor fit | 1 plumbing order to a vendor with 1 plumbing job in 12 months | Under 3 jobs | 🟠 Watch | Possible misassignment worth reviewing. Confirm the vendor holds plumbing licensing and insurance, and ask whether the assignment was intentional, such as a new vendor or a scheduling gap. |
Market figures: RealAI Ops Benchmarks, Sacramento County, as of Sep 30, 2026, 308 properties; RealAI Rent Index, Sacramento County, as of Nov 21, 2026 (average in-place rent $1,925 a month).
For the property manager, the unit-level rows are the day's work. For the asset manager, the pattern matters more: a low on-time rate, repeat repairs and high repair spend at the same property usually share a cause, often too few technicians or too much work sent out to vendors.
How RealAI tracks maintenance KPIs
Asset Monitor, a feature of RealAI Enterprise, runs these checks for you. It connects to your property management software, or reads the reports you already have, and adds RealAI's local operating benchmarks, so you don't pull work order reports or comps by hand.
On each run, daily, weekly, biweekly or monthly, it checks every open order for past-due, stalled and misrouted requests and for vendor assignments worth a second look. It tracks the trends too: on-time close rate, aging of open orders, work orders per unit, category mix, completions by vendor and category, and cost by category where costs are recorded. Tenant requests and make-ready work are kept separate. You set the thresholds and can add your own metrics.
When an order crosses a threshold, Asset Monitor drafts the message to the on-site team, reads the reply and keeps a live task list by property showing what's still open and for how long.
Like any monitor, it relies on the data behind it: cost trends need costs entered on each work order, and stalled-order checks need status updates.
FAQs
What are the most important maintenance KPIs for apartments?
On-time completion rate, open-order aging, backlog, make-ready turn time and repairs and maintenance as a share of income. Add a weekly check of every open order for past-due, stalled and misrouted requests.
What counts as an overdue work order?
One still open after its due date. The due date comes from its priority, so an emergency can be overdue within hours and a routine request after several business days.
How long should a routine maintenance request take?
A common target is 3–5 business days to complete, with a response within 1 business day. Your management agreement and local law may set different deadlines.
Why do work orders get stuck after a technician visits?
Usually the job needs parts or an outside vendor, or the work is done but the order was never closed. Both look the same in a report until someone asks.
Should tenant requests and make-ready work be tracked together?
No. Tenant requests affect resident satisfaction and renewals; make-ready time affects vacancy loss. Mixed together, each hides problems in the other.
Sources
- Market data: RealAI Ops Benchmarks for Sacramento County, CA (as of Sep 30, 2026, 308 properties) and RealAI Rent Index for Sacramento County (as of Nov 21, 2026). Accessed Nov 25, 2026.